Shandong China Coal Industry Group Co.,Ltd
|
Payment Terms: | T/T,L/C,D/A,WU;paypal |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Product introduction
1.expand the scope of concrete pouring2.reduce labor intensity3.simple operation4.economic
Specifications and technical parameters:Introduction of Manual Concrete Placing Boom
Manual Concrete Placing Boom is newly designed product in order to expand the scope of concrete pouring and improve the mechanization level of pump conveying.
It is a ancillary equipment for concrete pump and connected with concrete pumps.
Salient Features:
1. Manual concrete placing boom effectively solves the difficulty in wall puring and successfully reduces labor intensity.
2. It has reasonable design, stable and reliable structure. With 360 degree rotation and arm fabric structure, the machine has the advantages of simple operation, flexible rotation.
3. It has the advantages of high efficiency, energy saving, economy, practicality.
Parameters Type | BLG-12m | BLG-15m |
Casting range | 360m | 360m |
Working radius | 12m | 15m |
Rotating way | manual | manual |
Rotation Angle | 360° | 360° |
Pipe diameter | Φ133mm | Φ133mm |
Work weight | 800kg | 1200kg |
Machine weight | 1000kg | 1500kg |